City Industrial Building: asset enhancement of a 40-year-old, 11-storey industrial building at Tannery Lane
After four decades of service, City Industrial Building at 71 Tannery Lane needed more than a coat of paint. The 11-storey light industrial (B1) building houses warehouse, logistics and ancillary office space, with a 30-lot carpark and toilets on every floor, and it is used for both rental and sale. For the building's landlord at the time, City Developments Limited (CDL), CHO Associates delivered an Asset Enhancement Initiative (AEI) to renew the building's fabric, services and image, all while it stayed fully tenanted.
This one is close to our hearts. 71 Tannery Lane was once home to CHO Associates' own office, so we knew the building, its tenants and its quirks first-hand. Giving it a new lease of life was a project we were proud to deliver.
Project facts
- Building: City Industrial Building, 71 Tannery Lane, Singapore 347807
- Landlord at the time: City Developments Limited (CDL)
- Type: 11-storey light industrial building (B1), warehouse and logistics with ancillary offices
- Total area: 166,755 sq ft
- Building age: around 40 years
- Project: Asset Enhancement Initiative (AEI) and A&A works in a live, tenanted building
- Scope: rooftop waterproofing replacement, structural repairs, M&E upgrading, washroom modernisation on all 11 floors, an extended drop-off canopy and façade repainting
What we upgraded
- Rooftop waterproofing: complete replacement of the existing rooftop waterproofing with high-grade, weather-resistant membranes, supervised by Professional Engineers.
- Structural integrity: a comprehensive structural evaluation, targeted repair of concrete spalling and cracks, and an upgrade of the building's ageing M&E infrastructure.
- Washroom modernisation on all 11 floors: a full plumbing overhaul with corrosion-resistant piping, energy-efficient sanitary fittings, robust cubicles, enhanced ventilation and integrated safety systems.
- An extended drop-off canopy: a longer covered drop-off at the entrance, so tenants and visitors arrive and unload under shelter.
- Façade revitalisation: the entire façade carefully repainted, giving the building a fresh, contemporary look.
The challenges, and how we solved them
- A 40-year-old building: outdated infrastructure and fittings, especially the toilets across all 11 floors, meant much of the building's services had to be renewed, not just refreshed.
- No complete as-built drawings: our team surveyed and measured the building by hand, then redrew what we needed from the old drawings and records available, so every design decision was based on what was actually on site.
- Meeting today's codes: the upgrades had to comply with the latest local codes and regulations. Strategic planning and thoughtful design delivered the aesthetic and functional improvements without the need for additional authority submissions.
- A fully tenanted, "live" building: businesses kept operating throughout, so we planned the phasing and tenant communication carefully, working closely with the landlord and every tenant to keep disruption to a minimum.
How we kept the project on track
- Operational continuity: works phased floor by floor and zone by zone, with tenants told in advance what would happen, where and when.
- Regulatory compliance: proactive documentation, monitoring and adherence to local codes.
- Project timeline: strategic project management with contingency plans to ensure timely completion.
What the upgrade delivered
- Higher asset value and a stronger visual appeal
- Lower maintenance costs, thanks to quality, long-lasting materials
- Better rental potential and happier tenants
- Upgraded safety and accessibility standards
Upgrading an older industrial building in Singapore? Questions we hear most
Is it worth upgrading a 30- or 40-year-old industrial building?
Often, yes. An Asset Enhancement Initiative (AEI) renews the parts that tenants and buyers notice most, such as washrooms, entrances, rooftop waterproofing and the façade, at a fraction of the cost of redevelopment. It can raise the asset's value, reduce maintenance and improve rental potential.
How do you renovate a building that has no as-built drawings?
By surveying and measuring the building on site, then redrawing what is needed from whatever old drawings and records exist. The design is then based on what is actually there, which keeps surprises during construction to a minimum.
Can upgrading works be done while tenants are still operating?
Yes, with careful phasing and communication. Works are planned floor by floor and zone by zone, and tenants are told in advance what is happening and when. At City Industrial Building, washrooms on all 11 floors were upgraded while the building stayed fully tenanted.
Do A&A works always need authority approval?
Not always. It depends on the scope. Structural changes usually need submissions, but careful design can deliver many aesthetic and functional upgrades within the existing approvals. An experienced contractor will advise early on what needs approval and plan the programme around it.
What does rooftop waterproofing replacement involve?
Removing the failed system, repairing the surface beneath and laying new high-grade, weather-resistant membranes, ideally supervised by a Professional Engineer. Done properly, it protects the structure and the tenants below for years.
More from CHO Associates: another AEI we delivered at 55 Ayer Rajah Crescent, one-north · our CDL Queen Bee decarbonisation journey · our AEI, A&A and commercial renovation services · talk to our team